comparison

GLM 4.6 vs MiniMax M2.5

Token pricing, context window and real monthly cost, side by side. MiniMax M2.5 is the cheaper of the two for a typical workload — about 2.2× less.

cheaper for a typical workload
MiniMax M2.5
saves 55% vs GLM 4.6 at 1,500 in / 500 out × 200,000/mo
GLM 4.6 $303/mo
MiniMax M2.5 $135/mo
GLM 4.6 versus MiniMax M2.5 specifications and price.
metric GLM 4.6 MiniMax M2.5
Input / 1M $0.43 $0.15
Output / 1M $1.74 $0.90
Context 203K 205K
Cost @ typical workload $303/mo $135/mo
Modality Text only Text only
Price source routed routed
Provider Z.AI MiniMax

Snapshot . Cost uses a typical workload; tune it in the calculator. How we measure →

Which should you pick?

On a typical workload, MiniMax M2.5 costs $135/mo against GLM 4.6's $303/mo — roughly 2.2× cheaper. But the ranking depends on your output-to-input ratio: output is the pricier direction for both, so an output-heavy job (code generation, long answers) widens the gap while an input-heavy one (summarization, retrieval) narrows it. If you need to fit more in a single prompt, MiniMax M2.5 has the larger 205K-token window (~307 pages).

These are list and routed market prices, not measured outcomes. Two models at the same rate can still cost different amounts to finish the same task, because verbose or reasoning-heavy models emit more tokens. That gap is exactly what measured cost-per-task captures.

Frequently asked questions

Is GLM 4.6 or MiniMax M2.5 cheaper?

For a typical workload (1,500 input + 500 output tokens × 200,000 requests/month), MiniMax M2.5 costs $135/mo versus $303/mo for GLM 4.6 — about 2.2× less. Because output is priced higher than input, the winner can flip if your workload writes much more or less than this; check your own numbers in the calculator.

What's the main difference between GLM 4.6 and MiniMax M2.5?

On price, GLM 4.6 is $0.43/$1.74 per 1M (in/out) and MiniMax M2.5 is $0.15/$0.90. MiniMax M2.5 has the larger context window at 205K tokens.

More comparisons

Related